PROJECTED LOWER COLORADO RIVER OPERATIONS SCHEDULE

Releases from Davis and Parker dams will vary from about 8,000 cfs to 22,000 cfs during a 24-hour period. River levels will vary during the 24-hour periods with the higher levels coinciding with periods of peak hydroelectric power generation. Levels below the dams are usually highest during the afternoon and early evening. Average daily releases may vary in response to changing conditions.

Average daily releases and midnight lake elevations for the week, as well as anticipated average for the following 2 weeks, are scheduled as follows:

Date Parker Dam Average Releases (cfs)
Lake Havasu Elev.
(ft)
Davis Dam Average Release (cfs) Lake Mohave Elev.
(ft)
Hoover Dam Average Release (cfs) Lake Mead Elev.
(ft)
Glen Cyn Dam Average Release
(cfs)
Apr 1 13,800 448.6 18,000 644.0 20,300 1171.8 10,100
Apr 2 13,500 448.6 18,000 644.1 20,300 1171.6 10,100
Apr 3 14,000 448.5 18,000 644.2 20,300 1171.5 10,100
Apr 4 10,000 448.8 18,000 644.4 20,300 1171.3 10,100
Apr 5 13,500 448.8 18,000 644.5 20,300 1171.1 10,100
Apr 6 13,500 448.7 18,000 644.3 16,100 1171.0 10,100
Apr 7 13,500 448.7 18,000 644.0 14,200 1171.0 10,100
Average 13,100 - 18,000 - 18,800 - 10,100
Apr 8 to Apr 14 13,500 448.3 18,000 644.1 18,800 1170.0 10,100
Apr 15 to
Apr 21
13,500 448.3 18,000 644.2 18,800 1168.9 10,100

Current Lake Powell storage is 16,951 thousand acre-feet (KAF) (70 percent of capacity). Lake Mead storage is 19,150 KAF (74 percent of capacity). Total system storage is 43,294 KAF (73 percent of capacity). Lake Powell elevation is 3647.86 feet.

The Projected April-July forecast for the Colorado River is 4.0 million acre-feet or 50 percent of average as of April 1, 2002.

Yesterday, the average Colorado River flows were 705 cfs near the Yuma Fourth Avenue Bridge and 2,980 cfs at the Northerly International Boundary. The average release from Painted Rock Dam was 0 cfs and Alamo Dam was 25 cfs. The Morelos Dam diversions for the week of April 1, 2002 are expected to be 3,290 cfs.

All RIVER USERS should remember that fluctuating river flows may conceal or create natural hazards such as moving sandbars, gravel bars, unstable riverbanks, floating or submerged debris, or other unfamiliar obstacles. Caution should be be exercised while using the river between Davis Dam and the Mexican Border at San Luis, Arizona.

Back to Water Flow Reports